Skip to content

Drainage

Drainage

The Board is working with the city planner and engineer, as well as some adjacent neighborhoods, to address major rain event drainage.

Ed Fadek met with Rick Adams who, along with Port A City Engineer, assessed the drainage from the community, along and under SH 361, and the easement ditch to the bayside of the island.

TEXDOT will be working the ditches and drains along the highway for the next two weeks. We have some work to do on our side to clear pond drains.

Watch for crews near our gate.